You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air di Kampung Pulo akan Dipasang Katup

Valve Installed on Water Channel to Block Overflowing Waters

East Jakarta Administration is scheduled to install a valve on each end of the water channel in Kampung Pulo residential, Kampung Melayu. It is conducted to block the overflowing waters of Ciliwung River into the channel.

If the valve is installed, we will suck up the puddles using mobile pump. It can block overflowing waters of Ciliwung

Mayor of East Jakarta, Bambang Musyawardana disclosed, puddle comes out is due to unfinished normalization of Ciliwung River. Then the water flows to the channel.

"If the valve is installed, we will suck up the puddles using mobile pump. It can block overflowing waters of Ciliwung," he explained, Thursday (2/4).

Channel Normalization is Still Obstructed

He added, another effort is the channel will be installed with sandbags. The aim is the same.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye796 personTiyo Surya Sakti
  2. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye704 personDessy Suciati
  3. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye641 personTiyo Surya Sakti
  4. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye622 personNurito
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye448 personDessy Suciati